Infographic from Rombough Architecture: Your Home Remodel, a step-by-step guide to working with your architect. Phase I Schematic Design (4 to 6 weeks), Phase II Construction Documents (5 to 8 weeks), Phase III Construction Observations during construction, and a kitchen remodel in six steps.
Your Home Remodel: a step-by-step guide to working with your architect. Infographic by Rombough Architecture.
The short version

A home remodel with an architect moves through three phases. Schematic Design turns your goals and budget into one approved design. Construction Documents turns that design into signed and sealed permit drawings. Construction Observations keep your architect involved on site while it all gets built. Plan on roughly 9 to 14 weeks of design and drawing time before your permit set goes to the building department.

ISchematic Design4 to 6 wks IIConstruction Documents5 to 8 wks IIIConstruction Observationson site

Most people remodel a house once, maybe twice. So it makes sense that the process feels like a black box… you know where you want to end up, but not what happens between the first meeting and the first wall coming down.

The infographic above clears that up. It lays out Rombough Architecture’s step-by-step remodel process, the residential practice of architect Courtney Rombough, and it maps every step of an architect-led remodel in the order it actually happens. Below, we break down each phase, what you’ll be asked to do, and where the pricing checkpoints fall so your budget never gets ambushed.

The three architect design phases at a glance

Phase I

Schematic Design

4 to 6 weeks

Home visit, zoning check, room scans, a 3D model of your house, and three design options per floor.

You walk away withAn approved design and a pricing set for rough contractor estimates
Phase II

Construction Documents

5 to 8 weeks

Coordinated layouts, a full permit drawing set, and structural engineer coordination.

You walk away withFour signed and sealed full-size sets, ready to submit for permit
Phase III

Construction Observations

During construction

Site visits, problem solving with cost implications, and finish selections.

You walk away withAn architect on your side while it gets built

Phase I Schematic Design 4 to 6 weeks

Schematic design is where the big decisions get made: the layout, the size, how the new space connects to the old, and roughly what it will all cost. Nothing here is a construction drawing yet. It’s about getting the idea right before anyone spends money detailing it.

  1. Meet at your homeYou share the story behind the project, your goals, your concerns and your questions, and you talk through budget up front. Being honest about the number here saves weeks later.
  2. EstimateBefore any design work starts, your town’s zoning gets checked to confirm the project is actually feasible on your lot. Then you get a fee estimate for the schematic design phase.
  3. AgreementOnce you approve the estimate, the agreement comes to you through DocuSign along with the invoice for your initial retainer. Have your property survey ready when you sign, since the design starts from it.
  4. MeasureThe rooms affected by your remodel or addition get scanned, so the design is built on real dimensions instead of guesses.
  5. Model your homeYour existing house is built as a 3D model in Revit, the building information modeling software architects use to keep plans, elevations and sections in sync.
  6. Compare optionsYou review three designs for each floor: cost-conscious, midrange and dream. Your architect walks you through each one and recommends the best fit.
  7. Develop the designYour chosen option gets refined into a detailed 3D model. Progress updates and 3D views come by email, and you meet in person to review. Special finishes shown in renderings are priced separately.
  8. Finalize the designYou approve the design, and the project moves into construction documents.
Milestone

Ready for rough estimates.If you haven’t chosen a contractor yet, send the pricing set to three contractors. It’s your first real budget check, and it happens before you’ve paid for a full set of permit drawings.

Why three design options per floor?

Seeing a cost-conscious, midrange and dream version side by side does something a single design can’t. It shows you exactly what each extra dollar buys. Maybe the dream version’s vaulted ceiling is worth it and the bigger footprint isn’t. You make that call with real drawings in front of you, not a vague feeling that things are getting expensive.

Phase II Construction Documents 5 to 8 weeks

If schematic design answers “what are we building,” construction documents answer “exactly how.” This is the drawing set your contractor builds from and your building department reviews. In plain terms, these are your permit drawings.

  1. Update the estimateYou get an updated fee for the permit drawings before the work begins, so the cost of this phase is clear from day one.
  2. Coordinate layoutsWindows, doors, structure, electrical and lighting all get located on the drawings. Send these updated drawings to three contractors for refined pricing.
  3. Prepare permit drawingsThe full drawing set gets produced for the building department. Here’s what’s in it.
  4. Sign and sealYou receive four signed and sealed full-size sets for you or your contractor to submit to the building department.

What’s in a permit drawing set?

  • Title sheet with zoning, bulk standards, site plan, and area and volume calculations
  • Dimensioned floor plans and elevations
  • Building and wall sections
  • Window and door schedules
  • Plumbing riser diagram
  • Electrical and lighting plans
  • Structural details and framing plans, coordinated with a structural engineer
Milestone

Ready to submit for permit.Your signed and sealed sets are ready for you or your contractor to take to the building department.

Two rounds of pricing is one of the smartest parts of this process.

Rough numbers at the end of Phase I, refined numbers once layouts are coordinated in Phase II. Every contractor bids on the same drawings, so you’re comparing apples to apples, and any budget gap shows up while the design can still flex.

Phase III Construction Observations During construction

Drawings don’t build themselves, and no remodel goes exactly to plan once the walls are opened up. In this phase your architect is on site during construction to help resolve issues as they come up.

  1. On-site observationsFive site visits are covered by your initial retainer. When something comes up, your architect works through it with you and explains the cost implications of each solution, so you’re never choosing blind.
  2. Select finishesChoose finishes yourself, or work with an interior designer your architect recommends. The designer selects fixtures, appliances and lighting, and organizes everything into ordering schedules.
Good to know

You’ll often see this phase called “construction administration” in AIA contracts and at larger firms. Either way, the architect isn’t running the job site. That’s the contractor’s job. The architect’s role is to make sure what gets built matches what was designed, and to help solve problems when it doesn’t.

Kitchens

A kitchen remodel in six steps

Kitchens get their own track because more people are involved. An interior designer, a cabinetry company and the contractor all need the same information at the right time. Here’s how the kitchen remodel process flows.

Six kitchen remodel steps illustrated: interior designer, interior elevations, cabinetry drawings, construction, cabinet installation and finished kitchen
  1. Select an interior designerCoordinate a site visit.
  2. Interior elevationsYour architect sends them to your designer.
  3. Cabinetry drawingsYour cabinet company supplies these.
  4. ConstructionThe space is framed and built out.
  5. Cabinet installationCabinets go in per the drawings.
  6. Finished kitchenYour new kitchen, ready to use.

If you’re mapping out a kitchen remodel timeline, the design side follows the same phases above. On the build side, cabinetry drawings and ordering are often what sets the pace, so bringing your designer and cabinet company in early pays off.

3D views of a specific interior are quoted separately.

Why following the steps in order matters

The infographic puts it simply: following these steps in order helps keep quality high and costs under control. Here’s why that holds up.

  • Feasibility comes firstZoning gets checked before you pay for design, so you don’t fall in love with an addition your lot can’t support.
  • Real dimensions, real modelScanning and modeling the existing house up front means fewer surprises when construction starts.
  • Budget checkpoints are built inRough pricing after schematic design, refined pricing during construction documents. Two chances to adjust before you’re committed.
  • One set of drawings for everyoneContractors, the structural engineer, your designer and the building department all see the same coordinated documents.
  • Fees are quoted phase by phaseYou see the cost of the next phase before it starts.

How architect fees work in this process

Every remodel is different, so there’s no honest one-size-fits-all number for what an architect costs. What you can count on in this process is when you find out.

  1. Before you signA schematic design fee estimate, after the home visit and zoning check
  2. When you signThe initial retainer is invoiced with the agreement
  3. Start of Phase IIAn updated fee for the permit drawings
  4. During constructionFive site visits, covered by the initial retainer
  5. Only if you want themSpecial finishes shown in renderings, and 3D views of a specific interior, priced separately

That structure matters more than a ballpark figure. It means you’re never more than one phase into fees without knowing what the next step costs.

How these 3 phases compare to the “5 phases of architectural design”

Look up the phases of architectural design and you’ll usually find five, based on the standard AIA contract: schematic design, design development, construction documents, bidding or negotiation, and construction administration. Rombough Architecture’s three-phase process covers the same ground. It’s just organized around how a homeowner actually experiences a remodel.

Standard AIA phaseWhere it happens in this process
Schematic DesignPhase ISteps 01-06: home visit, feasibility, scan, model, three design options
Design DevelopmentPhase ISteps 07-08: develop and finalize the design
Construction DocumentsPhase IICoordinated layouts, permit drawings, sign and seal
Bidding / NegotiationPricingRough estimates after Phase I, refined pricing after Phase II step 02
Construction AdministrationPhase IIIOn-site observations and finish selections

Frequently asked questions

How long does it take an architect to draw plans for a remodel?

In this process, design and drawings take about 9 to 14 weeks: 4 to 6 weeks for schematic design and 5 to 8 weeks for construction documents. Permit review comes after that, and the timing depends on your town’s building department.

What is schematic design?

Schematic design is the first phase of architectural design, where the layout, size and overall look of a project get worked out and approved. For a remodel, that means visiting the home, checking zoning, measuring, modeling the existing house and comparing design options before anything is detailed for construction.

What are construction documents?

Construction documents are the detailed drawings a contractor builds from and a building department reviews for a permit. They include dimensioned plans, elevations, sections, window and door schedules, plumbing, electrical and lighting plans, and structural details.

Do I need an architect for a remodel?

Not always. Cosmetic updates usually don’t call for one. If you’re moving walls, adding space, changing structure or need permit drawings, an architect designs the project, coordinates the structural engineer and produces the sealed drawing set many building departments require.

How much does an architect cost for a remodel?

It depends on the scope of your project. In this process you get a schematic design fee estimate after the zoning check, an initial retainer when you sign, and an updated fee before permit drawings begin. Five construction site visits are included in the retainer.

What should I have ready before hiring an architect?

Your property survey, a realistic budget, and a clear list of your goals and concerns for the project. The survey is needed when you sign the agreement.

How many contractor bids should I get?

This process recommends three contractors, twice: once for rough estimates after schematic design, and again for refined pricing once layouts are coordinated in construction documents.

Rombough Architecture

Ready to start your remodel?

Rombough Architecture works with homeowners on remodels, additions and kitchens in and around Montclair, NJ. The first step is a meeting at your home.

Book a home visit
Free to share

Share this infographic

Feel free to use this infographic on your own site with credit. Copy the code below.

Generative Engine Optimization: Anatomy of a GEO-Ready Page

Reactions

0
0
0
0
0
0
Already reacted for this post.

Reactions

Your email address will not be published. Required fields are marked *